Hi, I’m Dr. Maja! Read my introduction to study extra about me and my two crossbreed canines, Lava and Hela.
Lava has been the absolute worst puppy from day one. Everyone who is aware of her can verify it, belief me, it’s not simply me. So understandably, her recall was non-existent. When strolling together with her off-lead in safe areas or letting her play in a canine park, each single canine would ultimately strategy me however her. It was irritating, to say the least. So I assumed, why not attempt an extended lead? It will probably be simpler to catch the little satan, and it could assist her studying recall. Let’s simply say, I used to be very unsuitable.
Possible Pros of Long Leads


Well, initially it was nice. The lengthy lead felt like a breakthrough in Lava’s coaching, to the purpose that she all the time had it hooked up. It allowed me to manage her higher, to catch her when she would ignore the recall, and in addition for different folks to catch her when she wouldn’t come to me. Yes, that occurred as nicely, and very often. Despite carrying all of the attainable treats in my pocket, if Lava had one thing on her thoughts, there was no stopping her. She was all the time pleasant and playful, however she was nonetheless a giant and bouncy pet, and that wasn’t all the time met with a smile. The lead simply gave me a false sense of safety that she couldn’t run off. Silly, I do know, as in fact she may, however even considering of taking the lead off brought on me anxiousness. The lead was round 30 ft in size and dragged like a really lengthy snake behind her.
Accidents Happen In a Split Second
After utilizing the lengthy lead for nearly two years, as I couldn’t belief her with out it, one thing that I may have by no means guessed occurred. On a sunny day within the UK, a financial institution vacation weekend, Lava and I have been out for our common stroll in a close-by park. Dogs and youngsters in all places. And Lava being Lava was working round like a lunatic on her lengthy lead, having one of the best time of her life. I used to be all the time shut and warning close by canine walkers of her lead so nobody would journey over it. It was exhausting ensuring Lava didn’t get into any hassle and ensuring she wasn’t wreaking havoc the place she handed. Mostly everybody cherished her, and he or she loved assembly canines on our stroll.
And then, in a break up second, I felt my day flip the wrong way up. Before I had the possibility to course of what I used to be seeing, Lava was working round me, entangling me together with her lengthy lead. What I feared would possibly occur to folks we meet on our walks was now occurring to me, and I had no time to react. As Lava continued working, this time away from me, I felt the sudden pressure of her pull pushing me violently to the bottom, and as I used my wrists to scale back the influence, I heard a horrific crack.


Thankfully, There Is the Adrenaline Rush
The solely factor I used to be grateful for within the subsequent hour was the adrenaline that prevented me from feeling the ache. The wrist was damaged and dislocated, however I stored my cool and with the assistance of a good friend, I acquired Lava dwelling safely first. By the time I reached the A&E, I used to be sweating from the ache and shock. To quick ahead a bit, after two months of carrying a forged, one surgical procedure and wires to maintain the bones in ample place whereas therapeutic, and months of rehab, now nearly three years in the past, it appears like historical historical past. Lava was a yr previous then.


She Seemed to Feel Guilty
I by no means blamed Lava. This was purely my fault, as I misjudged the scenario and wasn’t cautious sufficient. I largely felt unhappy that in the course of the time of my restoration, I couldn’t give her the train and the eye she required. But curiously, after I returned dwelling from the A&E that day, Lava checked out me as if she understood what had occurred. She was very quiet and unusually cuddly, and I cherished her consideration. Although I assumed on the time that she must have felt responsible for what occurred, I now perceive she should have picked up on my temper and did her finest to empathize with me. And I cherished her for it.


Trust Is Difficult to Obtain
Since the accident, I began letting Lava off the lead more, however the lengthy lead was nonetheless often in use. In the final yr, the lengthy lead was slowly put aside accumulating mud, and I began trusting Lava extra. At least making an attempt. As we’re dwelling fairly remotely now, I fear much less about her escaping, as she is nicely acquainted with the world and all the time comes again shortly. But it takes numerous effort on my finish to not fear when she does. I suppose I nonetheless must learn to belief her.


